Aged black EPDM over motors, transmissions, gearboxes and dynos. Restored in place with a fabric-reinforced acrylic system — no tear-off, and no shutdown.
| Building | Cleveland Brothers — Caterpillar machine shop, 60,000 sq ft |
| Location | Indiana, PA |
| Roof we found | Aged black EPDM |
| System installed | Fabric-reinforced acrylic basecoat + polyurethane-modified acrylic topcoat |
| Tear-off | None |
| Operations | No shutdown |
A 60,000 sq ft roof of aged black EPDM over a working Caterpillar machine shop — a building full of motors, transmissions, gearboxes and dynos.
That is equipment you cannot expose to weather and cannot easily move. A tear-off would have meant opening the roof over it, section by section. So the question was not whether the roof needed work. It was whether the existing EPDM could carry a restoration system instead of coming off.
We restored it in place. The existing EPDM stayed on the building and became the base for a new, seamless system:
Because nothing came off, the shop kept working underneath. It is the same system we used on the PennDOT District 10 maintenance shop — over aged black EPDM here, over aged TPO there.
Why it matters beyond this building: together with PennDOT District 10, it shows one restoration system working over both EPDM and TPO — the two membranes most aging commercial roofs in Western Pennsylvania are made of. Aged black EPDM is one of the most common and most reliable restoration candidates in this region.
Usually, if three things are true:
If those hold, restoration typically costs far less than replacement. If they do not, we will tell you that too.
If your building cannot close for a roof — because of what is underneath it, or because the work cannot stop — restoration in place is often the answer. We will look at the roof and tell you plainly whether it qualifies.
📞 412-888-0283 · Monday–Friday, 7 a.m.–5 p.m. · 1410 Wayne Avenue, Suite D, Indiana, PA 15701
Yes, when the insulation underneath is dry and the deck is sound. On the Cleveland Brothers machine shop we restored 60,000 sq ft of aged black EPDM with a fabric-reinforced acrylic basecoat and a polyurethane-modified acrylic topcoat, without tearing it off.
No. The roof was restored in place, with no tear-off and no shutdown. The equipment underneath stayed where it was.
A replacement tears the roof off to the deck and rebuilds it, which can also trigger an insulation upgrade under the energy code. A restoration keeps the existing roof in place and builds a new, reinforced surface on top — when the roof qualifies, at far less than replacement.