Commercial low-slope roofing only · Family-owned in Indiana, PA · SBA HubZone certified

Mon–Fri 7:00am–5:00pm · 412-888-0283

Commercial Roof Replacement

We lead with restoration — which is exactly why you should take it seriously when we tell you a roof has to come off.

Most of this website argues that commercial roofs get torn off when they did not need to be, and that is true. It is the single most expensive avoidable decision a building owner makes.

But some roofs are genuinely finished. The insulation is saturated, the deck has failed, the membrane is past anything a coating can bridge, or a storm has taken the structure. In those cases a coating is not a saving — it is money spent on a roof that is already gone, and it delays the real repair by a year or two while the water keeps working.

When that is the answer, we say so and we do the work. Full tear-off, deck repair or complete re-sheathing, structural repair with an engineer and a permit where it is needed, and a new roof system specified for the building.

Here is what that looks like.

Tear-off debris from the Delaney Chevrolet showroom roof

Roofs We Took Off — and What We Found Underneath

Delaney Chevrolet — 50 to 60 years of roofing, in layers

A dealership showroom carrying roughly four roofing systems installed one on top of another over five or six decades. Nobody had ever taken any of it off; each contractor had simply gone over the last one.

We removed an estimated 40,000 pounds of wet, soggy, saturated roofing material off the showroom floor.

Then: new polyisocyanurate insulation board, a spray foam roofing system, an acrylic basecoat, and a highly reflective white polyurethane-modified acrylic topcoat as the finished membrane.

Environmental Pest Management — the deck had rusted through

A failing EPDM roof where all of the insulation was completely saturated. Complete tear-off. The metal B-deck was repaired everywhere it had rusted or rotted out — you cannot put a new roof on a deck that is failing.

Then a new 5-inch tapered insulation system, new drains, and a 60 mil PVC membrane.

(This was their second roof with us. The first was a tar-and-chip gravel roof we restored with spray foam rather than replacing — same building owner, two roofs, two different answers.)

Wolfendale's — a new roof deck, not just a new roof

A failed EPDM system on an old wooden roof structure. Complete tear-off, and then the entire roof deck was re-sheathed in Advantech because the original decking was no longer sound.

New polyiso, a new roof hatch, then a spray foam roofing system with an acrylic basecoat and polyurethane-modified acrylic topcoat.

Tyger Paints — hail, and a deck that had been failing quietly for years

An insurance claim. Hail destroyed an aged, brittle TPO membrane — but the tear-off is what showed the real condition. We removed the TPO and the asphaltic system beneath it down to the original 1×4 deck boards, many of which were compromised, and repaired rotted roof joists that years of leaking had damaged.

The entire roof was re-sheathed in ¾” Advantech for structural, weather and water resistance. Then a full R-30 tapered insulation system, a fully adhered 60 mil PVC membrane, and new gutter and edge metal around the entire parapet.

Indiana Motorcars — the roof had already come down

An insurance claim after winter storms. The rear section of the flat roof collapsed under the weight of ice and snow, snapping several wooden joists in an older wooden roof structure.

We demolished the failed areas, produced engineered plans with an engineer and the permit department, structurally repaired the joists, re-sheathed the entire roof, and repaired other rotted joists that years of leaking had already weakened.

Then a full R-30 tapered insulation system, a fully adhered 60 mil PVC membrane, new gutter and new edge metal around the entire parapet.

Rotted plank deck exposed after tear-off at Indiana Motorcars
AdvanTech sheathing on site for the Indiana Motorcars re-deck
New joists installed during the Indiana Motorcars structural repair

The Pattern Worth Noticing

Look at them again. Every tear-off on this page needed deck or structural work that was not visible from the roof surface.

  • Delaney: four layered systems and 40,000 pounds of saturated roofing material
  • Environmental Pest: B-deck rusted through
  • Wolfendale’s: the whole deck re-sheathed
  • Tyger Paints: 1×4 deck boards compromised, joists rotted
  • Indiana Motorcars: joists snapped, structure collapsed

That is not a coincidence. It is what a genuinely failed roof looks like. By the time a roof needs replacing rather than restoring, water has usually been working on the structure underneath for years — quietly, invisibly, from above.

Two things follow from that, and they matter whichever direction your project goes:

A tear-off bid written without knowing the deck condition is an estimate, not a price. If nobody has surveyed for moisture and nobody has opened the roof, the deck and structural work is a change order waiting to happen — on every tear-off on this page, it would have been.

Which is the argument for finding out early. An infrared survey on a roof that still has options is the difference between a restoration at a fraction of the cost and a full replacement with structural repair three years later.

→ Roof Inspections & Infrared Surveys

What We Replace Roofs With

Conklin Flexion 2.0 — 60 mil PVC, fully adhered. A PVC/KEE copolymer-alloy membrane with a Kevlar-reinforced fastening edge and heat-welded seams. It carries the longest material warranty on Conklin’s roofing line — up to 25 years, and its formulation is built to resist the plasticiser migration that makes conventional PVC brittle with age. This is what went on Tyger Paints, Indiana Motorcars, Environmental Pest and Aroma Joe’s.

Spray foam roofing systems. Seamless, self-flashing, and both the insulation and the substrate in one application — with slope built by spraying rather than by tapered board layout. This is what went on Delaney Chevrolet and Wolfendale’s. → Spray Foam Roofing

TPO, where the building’s exposure and budget make it the right specification. We install it — and we will tell you honestly when the PVC upgrade is worth the difference and when it is not.

Tapered insulation systems, including full R-30 assemblies where the code requires them and where the owner wants the energy improvement.

We carry more than one line on purpose. If you only sell one system, every roof needs that system. Your roof gets the one that fits its exposure, its use and its structure.

Finished white PVC roof at Aroma Joe’s

Decks, Structure and Permits

This is where a lot of roofing contractors stop, and where much of our replacement work actually lives.

Deck repair and full re-sheathing. Metal B-deck repaired where it has rusted through. Wooden decks re-sheathed in Advantech when the original boards are no longer sound.

Structural repair. Rotted and snapped joists repaired or replaced.

Engineered plans and permits. At Indiana Motorcars we worked with an engineer and the permit department to produce stamped plans for the structural repair before any roofing began. That is a different scope from roofing and it is one we are set up to run.

Insurance claim work. Tyger Paints was a hail claim; Indiana Motorcars was an ice-and-snow-load collapse. We are used to documenting damage, working through scope with adjusters, and carrying a claim project from collapse to finished roof.

Understand What a Tear-Off Sets in Motion

If you are replacing rather than restoring, it is worth knowing the full scope before you compare bids.

Removing a commercial roof down to the deck generally requires the new assembly to meet current energy-code insulation values — around R-30 in our climate, roughly five inches. That usually raises the roof height, which often means penetrations extended, curbs raised, perimeter edge metal replaced and drainage reworked — how much depends on the building, and the code allows less insulation where existing conditions leave no room. Ask your bidder whether it is in the number.

That work is real and it belongs in the number. It is also frequently missing from the roofing line of a bid, which is how a replacement project grows after it starts.

We install these assemblies — Tyger Paints, Indiana Motorcars and Aroma Joe’s all received full R-30 tapered systems — so we can tell you what each piece of it costs rather than discovering it with you.

Requirements vary by jurisdiction and are periodically updated. Your local code official confirms what applies to your building.

Tapered insulation being laid at Old Thunder Brewing

What Drives Replacement Cost

Every replacement is priced after we inspect the roof: its size, the system, how many layers come off and what the tear-off exposes all change the number. Where a roof qualifies, restoration costs far less.

Deck repair, structural work, engineered plans and permits depend entirely on what is found. We would rather find it during the inspection than during the tear-off, which is why we survey first.

Figures reflect published industry and Pennsylvania market ranges. Your building gets a specific number after we inspect it.

New Construction

We build new roofs as confidently as we replace old ones. We do complete tear-offs and new construction across every system we offer — single-ply TPO and PVC, coatings, spray foam roofing and metal — on buildings like Aroma Joe’s Coffee, the Bloxdorf Contracting garage, and Old Thunder Brewing in Blawnox.

Full tapered insulation systems, PVC membrane or spray foam, and the detail work that new construction actually turns on: through-wall scuppers, custom conductor boxes and downspouts matched to the building facade, edge metal around the parapet, roof access ladders, and HVAC mounts fully integrated into the roof system rather than set on top of it.

On new builds we also do the walls and more — closed-cell foam insulation, below-grade waterproofing, and floor coatings. If you are a general contractor with more than the roof to place, that is one conversation rather than four.

When You Should Not Replace

Because it works both ways.

If the insulation is dry and the deck is sound, a tear-off is usually the most expensive way to solve the problem in front of you. A restoration coating carries a manufacturer warranty, costs far less, and can be recoated at the end of its term for a fraction of the original restoration cost.

We will tell you that, even standing on a roof you have already decided to replace. It is the whole reason this company leads with coatings.

→ Commercial Roof Coatings

Serving Western and Central Pennsylvania, Ohio, West Virginia and Maryland

From our base in Indiana, Pennsylvania, we work across Western and Central Pennsylvania, plus Ohio, West Virginia and Maryland — including Pittsburgh, Johnstown, Altoona, State College, DuBois, Punxsutawney, Greensburg, Ebensburg and Somerset.

Get a Straight Answer

We will inspect the roof, survey it for trapped moisture, and tell you plainly whether it should be restored or replaced — with the reasoning, in writing. You keep the report either way.

Frequently Asked Questions

When does a commercial roof need to be replaced instead of restored?

When the insulation is saturated, when the deck or structure has failed, when the membrane has deteriorated past what a coating can bridge, or when storm damage has compromised the structure. A roof with dry insulation and a sound deck is usually a restoration candidate — an infrared moisture survey is what tells the two apart.

How much does a commercial roof replacement cost?

It depends on the roof’s size, the system, how many layers come off and what the tear-off exposes, so we give you a specific number after we inspect it. Deck repair, structural work and permits depend on what the tear-off finds.

Do you repair the roof deck and structure, or only the roofing?

Both. We have repaired rusted metal B-deck, re-sheathed entire wooden decks in Advantech, and repaired and replaced rotted and snapped roof joists. At Indiana Motorcars we produced engineered plans with an engineer and the permit department for structural repair after a roof section collapsed under ice and snow load.

What roof systems do you install on a replacement?

Fully adhered 60 mil PVC membrane, spray polyurethane foam roofing systems, TPO where it is the right specification, and tapered insulation systems including full R-30 assemblies. We carry more than one line so the system can be chosen for the building rather than for our inventory.

Do I need to add insulation when I replace my commercial roof?

Generally yes. Removing a roof down to the deck typically requires the new assembly to meet current energy-code insulation values — around R-30 in our climate. Where that raises the roof, it often also means extending penetrations, raising curbs and replacing perimeter edge metal at the new height — the code allows less insulation where existing conditions leave no room, so ask your bidder what is included. Your local code official confirms the specifics for your building.

Do you work on insurance claims?

Yes. Tyger Paints and Indiana Motorcars, described on this page, were insurance claims — hail damage that destroyed an aged TPO membrane, and a roof section that collapsed under ice and snow load. We document damage, work through scope, and carry the project through to a finished roof.

Can you replace a roof while the building stays open?

Usually, with sequencing and planning — most of these buildings stayed in use. Whether that is practical depends on the building, the contents underneath and the weather window, and it is one of the honest advantages restoration has when a roof still qualifies for it.